Monday, August 28, 2006

The Saga Continues.

If anyone can believe it, days away from beginning the septic project, everything stopped. What happened is that an easement stipulation was overlooked by the engineer and after having the property surveyed, the septic mound won't fit.

Now we are back to the drawing board and back to waiting. We will now be getting a drip disposal field or something like that. It will take another week to design, the county still has to approve it, and the supplies will take 2 weeks to order. Then, if we are lucky the system will be built. Now won't that be darned excited. We only hope to move in before the rains begin, since it doesn't yet have its new roof. And yup, it needs one.

0 Comments:

Post a Comment

<< Home